image004 image002
 image003  image001
Client: Zellner Construction Services

Location: Memphis, Tennessee

 
During 2012 and 2013 The city of Memphis began the construction phase of a new park, landing, and dock facility for the Mississippi Riverfront Development. The large riverboat “American Queen” will berth at this location while in Memphis. Zellner Construction Company was awarded the 14 Million dollar contract to construct the park, landing, dock, and bulkhead and Arc Surveying and Mapping was awarded the construction layout and field engineering contract.

  This project was multi-faceted and Arc performed surveying services in the following areas:

  • Dredging support and quantities (Single Beam hydro, Hypack)

  • Bulkhead and sheet pile layout (Trimble RTK, GPS, Robotics)

  • Revetment and concrete mat layout (RTK, GPS, Robotics)

  • Utility layout (Trimble RTK, GPS, Robotics)

  • Pile and foundation layout (Trimble RTK, GPS, Robotics)

  • Grading (Trimble RTK, GPS, Robotics)

  • Vertical construction layout (Trimble RTK, GPS, Robotics)

  • Flatwork layout and ADA controls (Trimble RTK, GPS, Robotics)

  Relevance to this Contract:

  • GPS Surveying

  • Construction Layou

  • Dredge Material Measurement